BIM Case Studies
BIM Case Study 3

Problems

  • Constant change of design by the owner was adversely impacting the progress
  • Key design changes were encountered during the project which posed challenges that made coordination between third parties a nightmare.

Solutions

  • Usage of IPD enabled baselining of drawings at the design stage.
  • Baselining helped detecting clashes between architectural, MEP and structural element.
  • Verve enabled digital design options on the same model that helped client finalize design despite changing requirements.
  • BIM enabled implementation of the needed structural changes quickly.

Benefits

  • The architect, by involving Verve's BIM team detected the clashes during the early stages of design.
  • This saved considerable hours of manual checking of clashes.
  • Benefits accrued by the architect translated to over 20% cost savings for the owner.